How to build a deck

Building a deck is mostly about the parts you can't see. Here's the full process, from planning and approval to footings, frame, boards and stairs.

String lines and pegs marking out a deck in a backyard

To build a deck, you plan the size and height, check whether it needs approval, set out and pour footings, build a level frame of bearers and joists, fix the boards with the right gaps, then add stairs, a balustrade if it's high enough, and oil or finish. The frame and footings decide how long the deck lasts, so most of the care goes there. A small, low deck on flat ground is a realistic DIY job. Raised decks, slopes and stairs are where most people bring in a builder. For costs, materials and how we arrange a quote, see our deck builder home page.

Step 1: Plan the deck

Planning a deck means deciding its size, height, shape and material, and checking the ground. Measure from the back door to set the finished height, usually one step below the door sill. Look for slope, drainage, pipes, trees and how the sun moves across the area. Then pick the boards and the frame material, because they set the joist spacing.

A planning checklist:

  • Size and shape. Allow at least 3 by 3 metres for a table and chairs.
  • Height. Under about 1 metre keeps NSW exempt development possible and usually avoids a balustrade.
  • Sun and shade. West-facing decks get the hottest afternoon sun in Albury. Plan shade, or choose pale boards.
  • Drainage. Water must run away from the house and out from under the deck.
  • Services. Check for buried pipes and cables before digging (Before You Dig Australia can help).
  • Materials. See best timber decking or composite decking.

Step 2: Check approval and the rules

Before buying anything, check whether your deck needs approval. In NSW, a deck is exempt development only if it meets every state standard, including a floor no more than 1 metre above ground, size and height limits, and sitting behind the building line. In Victoria, the VBA says most decks need a building permit. Heritage and bushfire areas add rules on both sides.

Deck boards being laid with a spacer on a new frame

Rules that apply to every deck, whatever the approval:

  • Balustrades. The National Construction Code requires a balustrade where a deck is more than 1 metre above the ground below. It must be at least 1 metre high, with gaps no wider than 125 millimetres.
  • Licences. In NSW, paid residential building work over $5,000 must be done by a licensed builder under a written contract.
  • Bushfire. On bush fire prone land, materials must suit the block's bushfire attack level.

Our guide on whether you need council approval for a deck covers each step.

Step 3: Set out and dig the footings

Mark the deck's outline with string lines and pegs, then square it using the 3-4-5 method and by checking the two diagonals match. Mark where each footing goes, based on the bearer spans for your frame. Dig the holes to the depth and width your soil and frame need, then set posts or post brackets in concrete and let it cure.

Footing tips for Albury and Wodonga:

  • Clay soils move. Much of the area has reactive clay, so footings need to go deep enough for your soil.
  • Keep timber out of the ground. Use galvanised post brackets set in concrete, or H5 treated posts if they go in the soil.
  • Check levels now. Footings set at the right heights make the frame much easier.

For very low decks on firm, level ground, see deck blocks as an alternative.

Step 4: Build the frame

The frame is bearers, which sit on the posts, and joists, which sit on the bearers and carry the boards. Fix the bearers level, then lay joists across them at the spacing your boards need, usually 450 millimetres for hardwood and often closer for composite. Brace the frame, check it's level and square, and leave room for air to move underneath.

Frame choices:

  • Treated pine. H3 for well-ventilated frames, H4 for decks within 400 millimetres of the ground, as WoodSolutions advises.
  • Steel. Galvanised steel won't rot and spans further. See steel deck framing.
  • Sizes. Joist and bearer sizes come from span tables for your timber grade and spacing. See decking frame timber.

Seal every cut end of treated pine, and use fixings rated for treated timber.

Step 5: Lay the boards

Start with a straight board along the edge nearest the house, then work outwards, keeping an even gap between boards for drainage and movement. Hardwood boards are pre-drilled and screwed. Composite boards are clipped. Stagger the board joins so they don't line up, and make each join land on a joist. Trim the ends straight once all the boards are down.

Board laying tips:

  • Gaps. Often 3 to 5 millimetres for hardwood, set by the brand for composite.
  • Pre-drill hardwood near the ends to stop splitting.
  • Stainless screws stop black stains on tannin-rich timbers like merbau.
  • Check alignment every few rows with a string line.

For composite specifically, see composite decking installation. For a low deck, see how to build a deck at ground level.

Step 6: Build the stairs

Deck stairs are made of stringers (the sloping sides), treads (the steps) and sometimes risers (the vertical faces). The National Construction Code sets the limits for steps in a house: each rise between about 115 and 190 millimetres, each going (the depth of the tread) between about 240 and 355 millimetres, and every step in a flight the same size.

How to plan a set of deck stairs:

  1. Measure the total rise from the top of the deck to the ground.
  2. Divide it into equal steps that land within the rise limits.
  3. Cut the stringers to suit, from treated or hardwood timber or steel.
  4. Add a handrail where needed, and a balustrade if the stairs are high.
  5. Give the bottom step a firm base, such as a concrete pad, so it doesn't sink.

Step 7: Finish and look after it

Finish the deck with fascia boards to hide the frame edge, then oil or stain timber once it's ready. New hardwoods often need a few weeks to weather first. Composite needs no finish. After that, sweep it often, wash it a few times a year, keep the gaps clear, and re-oil timber every 12 to 24 months.

See how to oil a deck for the method, and how long a wooden deck lasts for what to expect.

Can you build a deck for $5,000?

Yes, if it's small and low. Using published installed prices of about $180 to $350 a square metre for treated pine, $5,000 covers roughly 14 to 28 square metres built by a builder, or more if you do it yourself and only pay for materials. In hardwood or composite, the same budget covers about 7 to 18 square metres. Height, stairs and a sloping block reduce what it buys.

For a full breakdown by size and material, see deck cost.

Questions people ask

How long does it take to build a deck?

A builder usually takes three to six working days to build a simple 15 to 25 square metre deck once materials are on site. A first-time DIY build often takes several weekends. Raised decks, stairs, balustrades and approvals add time, and wet weather delays footings and concrete. Allow extra time for the concrete to cure before building on it.

What should you ask a builder before they build your deck?

Ask what the frame is made of and how it's protected, what joist spacing and fixings they'll use, the gap between boards, whether it needs approval and who arranges it, and what's included. Ask for the quote in writing. In NSW, check the builder holds a licence for work over $5,000.

Do you need to be home while a deck is built?

Usually only at the start, to confirm the layout, height and step positions, and at the end, to walk through the finished deck. In between, the builder needs access to the site and power. Agree on gates, pets and where materials can be stacked before work starts.

What's the hardest part of building a deck?

For most people, it's the footings and the frame: setting out square, getting every footing at the right height, and building a frame that's level, braced and at the right joist spacing. Laying boards is satisfying by comparison. Stairs are the other tricky part, because every step must be the same size.